"George and his team were brilliant. Very professional, clean and tidy job.They made sure that I understood how the system worked prior to leaving. I would definitely recommend Perth Reticulation Experts to anyone getting any reticulation work done."

Reticulation Port Kennedy
We've been booked 14 times in Port Kennedy and service the surrounding Mandurah-region area daily — so getting a technician to your place is easy. 9 of those were in 2025.
✓ 24,000+ jobs completed across Perth · 14 jobs completed in Port Kennedy and counting · ★ 4.7 from 230 Google reviews
Call (08) 6263 4644 to book a repair, or book a site assessment for a new system.
Your local Port Kennedy reticulation team
Whether it's an older system that's started playing up or a new landscape that needs waterwise coverage from day one, we handle the lot — repairs, servicing, controllers, bores and full installations.
Verge planting and reticulation rules sit with the City of Rockingham, while watering days come from the Water Corporation sprinkler roster, not the council — worth checking both before any verge retic work. Our depot in Jandakot puts Port Kennedy about 32 km away, comfortably inside our everyday coverage.
We’re a Water Corporation Waterwise Garden Irrigator and an Irrigation Australia member, every job is backed by our workmanship warranty, and we’re rated 4.7 from 230 Google reviews.
Reticulation help in Port Kennedy & nearby
We also look after Warnbro, Secret Harbour, Karnup, Waikiki, Safety Bay, Golden Bay, Cooloongup and the wider Perth metro. Read our pricing guide or call to get started.
Nearby: Warnbro · Secret Harbour · Karnup · Waikiki · Safety Bay · Golden Bay · Cooloongup
What does Port Kennedy’s soil and water mean for your retic?
Soil — Quindalup coastal sands. Water races through Quindalup dune sand, so one long soak runs straight past the roots — two short cycles on the same watering day, plus soil wetters, are the proven local approach.
Groundwater & bores. Good bore country: the superficial aquifer is within practical drilling reach under these sands. Watering from a bore costs pumping power rather than scheme rates — with the same 2-day roster and winter ban as everyone else.
Rainfall — about 750mm a year. Averages about 750mm a year at the Medina Research Centre gauge with roughly 77% falling May-September — so the controller should step down through autumn and observe the 1 June - 31 August sprinkler switch-off.
Sources: DPIRD-064 Soil Landscape Systems (SLIP) · DWER Perth Groundwater Map / Water Corp groundwater areas (band-level) · BOM station 009194 Medina Research Centre climate averages · Water Corporation watering roster (verified Jul 2026)
What kind of retic work do we do in Port Kennedy?
Our Port Kennedy history runs 14 jobs deep, and the pattern is clear: controller work, solenoid & valve repairs and bore & pump work lead the list. 13 of those jobs are from the last two years.
From our Port Kennedy job book
A Port Kennedy valve that came on with everything
A Port Kennedy system had station 1 sticking on — it came on with every other station rather than only its own. That is a specific fault worth naming, because it differs from a valve stuck permanently open. A solenoid valve (the electrically-operated valve that feeds one station) is held shut by water pressure trapped above its diaphragm, fed in through a small pilot hole.
Anything that lets that trapped pressure escape means the diaphragm can no longer hold itself down on the seat. Debris on the seat, a blocked pilot hole, a split diaphragm or a solenoid that is not screwed down tight will each do it — so the moment another station pressurises the mainline, this valve opens along with it. The result is one area watered on every cycle, several times what the schedule intended, while the rest of the system runs at reduced pressure.
Our technician replaced the station 1 solenoid, along with broken sprinklers and garden sprays, and repaired a leaking pipe near the driveway. A further system test was run and the controller programmed. If one zone is always wet, it is worth checking whether it is running when it should not be.
What we actually find in Port Kennedy
Of our 14 Port Kennedy jobs we read the 6 with the fullest, most recent notes — capped, and not a random sample. 5 involved failed solenoids and valve coils, against 23% across the 1,781 Perth jobs sampled the same way. Enough to shape where we start; not enough to call Port Kennedy unusual.
Need the same kind of help? Book a repair or arrange a site assessment.
Reticulation Repairs in Port Kennedy
Broken pop-ups, a leaking solenoid, dry patches or a controller that’s lost the plot? Our fully-equipped technicians diagnose and fix most Port Kennedyfaults on the spot. Repairs aren’t quoted – call us and we’ll book the visit.
New Systems in Port Kennedy
Putting in a new lawn or upgrading a tired system? We design and install fully automated, waterwise reticulation for Port Kennedyhomes. Book a paid site assessment — credited in full to your install if you accept the quote within 30 days.

Hear From Our Happy Customers...
"George provided excellent, efficient service. Highly recommended!"
"Dylan assessed the situation gave his expert opinion and completed without any delay Appreciated"
"Thanks to Thibault from Perth Reticulation for your friendly service today. Highly recommended. Fast response time - and very efficient/thorough in both diagnosing and fixing the many issues in my reticulation so that my garden can recover and thrive over the coming warmer months. Thanks for a great job well done."
"Tom was great! Very knowledgeable and helpful throughout. Great experience for me!"
"Dylan was friendly, informative and very efficient. Would highly recommend Dylan and Perth Reticulation Experts to anyone having problems with their retic. Thanks Dylan much appreciated."
